Salut. April
07.04.2024

Front Tower I is pouring the 25th residential floor slab. The 25th floor vertical elements are being installed. The 26th floor vertical elements are being installed.

View Tower has brickwork completed on the 23rd and 24th floors. Brickwork is being performed at the 25th floor level. Brickwork has begun on the 31st floor.

View the photo report

   